Apparatus placement in a drill
Last updated November 16, 2026
Module. This page covers how it plays out during a drill. To turn it on for a scenario, see Module: apparatus placement.
The module asks each crew one question when they arrive: where did you put your rig? Their answer decides what they can see for the rest of the drill.
Parking your own apparatus#
When your unit reaches the scene you are taken to the Aerial tab and the side tabs lock. Click the aerial where you set up.
The rig appears where you clicked, at its real size when the aerial was fetched in the builder: an engine is about 33 feet long on the ground, a battalion chief's SUV about half that. An aerial that was uploaded has no ground scale, so its rigs start at a standard size. From there:
- drag it to move it,
- scroll on it to size it to the photo, and Reset scale to put it back,
- use the Rotation slider to point it the way it is facing.
Which way a rig faces is not decoration. It is the difference between an engine laid in for a forward lay and one that has blocked the truck's approach.
When it looks right, press On scene.
Where you park is where you arrive#
The aerial is divided into the four sides of the structure, drawn as wedges with A, B, C and D marked. Park in the Charlie wedge and you walk out looking at Charlie.
That is the whole reason the question is worth asking. A crew that sets up on the wrong side of the building spends the drill looking at the wrong side of the building, exactly as they would on a real fireground.
Once you have confirmed, the side tabs unlock and you can walk the building normally.
Running a placement-only drill#
Some nights the whole exercise is where the rigs go. A placement-only drill is the same scenario with everything but the aerial set aside: no sides, no interior, no fire to fight. Everyone gathers round the map, moves the rigs, runs the supply lines, and talks through why. It is a tabletop, and it is built to stay out of the way of the conversation.
It is a way of running a scenario, not a second scenario. You never build an "apparatus only" copy of one you already have.
Starting one. Schedule it ahead of time with the drill type set to Apparatus placement (see Scheduling a drill), or decide on the night: load the scenario as usual. If it has sides and an aerial, the row asks Full drill or Apparatus placement: choose placement. A scenario built with only an aerial has nothing to choose and loads as a placement drill by itself. Scenarios that can run this way carry a Placement marker in the list, and searching the list for "placement" finds them. A scenario needs an aerial and the placement module turned on to qualify, and it has to be a structure scenario: hazmat and wildland scenarios run as full drills only.
Everyone is on scene the moment it starts. There is no dispatch, no arrival windows and no waiting for your unit: press Start and the whole room is looking at the aerial together.
Anyone can move anything. Nobody is assigned to a rig. Rigs the scenario's author already placed start where they were put. The rest wait in a Not yet on the map tray above the aerial: pick one, click where it sets up, then drag it, scroll to size it, and turn it with the rotation slider. Anyone can do that with any rig, guests included, and anyone can move a rig somebody else placed. If two people grab the same one, the last move wins. Anyone can also lay and disconnect supply lines, set and move drop tanks, and draw and label on the map.
The fireground rules still hold, because they are the point: a hydrant feeds one line, an FDC takes two and only from a rig, a drop tank takes two, nothing comes from one that is out of service, and a medic takes no line.
What is not in it. No crew assignments, no command board, no injects, no additional alarms, no CAN reports, no PAR and no elapsed-time notifications. The side panel has one tab, Events, which lists who placed or moved which rig and who ran which line.
The people are across the top, where the assignment bar sits in a full drill: instructors and admins first, then the department's members, then guests. The order never changes while you watch. Whoever is talking lights up green where they already are.
Open microphones, the whole time. A placement exercise is a conversation, so the radio works the way the lobby does: every microphone open, several people talking at once, your normal voice. The instructor has Mute everyone, which closes every microphone in the room; each person opens their own again. Nobody can open someone else's.
Nothing said is recorded. No audio file, no transcript. The screen says so for the length of the drill: Open mics. Not recorded. That is different from a full drill, where every transmission is recorded and transcribed.
In one room? Wear headsets. If the crew is sitting together, every person needs a wired or wireless headset with a microphone. A device cancels the echo of its own speaker, not the laptop beside it, and open microphones in one room without headsets will feed back.
When it ends, everyone goes home. The drill and the debrief happened at the same time, so there is no after-action review and no scored evaluations. The record of the drill (who placed and moved which rig, and when, and every supply line) is kept for instructors and admins, who open it from the After-Action Review tab where it is labeled Apparatus placement. Crew members and guests cannot open it.
It counts. Time in a placement drill goes on each member's training record as its own type, apart from full drills. See Training hours.
Supply lines#
On the aerial, anyone assigned to a rig, and the instructor, can lay a supply line: from a hydrant to an engine, from an engine to another engine, from an engine to a truck or a tender, from a rig to a fire department connection on the building, or, where there are no hydrants, from a drop tank or a water source to the engine drafting from it. Press Lay supply line, click one end, click along the route to lay the hose round the buildings the way you would on the street, and click the other end to finish. On a phone, tap instead of click. Escape or Cancel abandons the route; Undo point or Backspace takes back the last vertex. Nothing in the drill waits on a line: laying one is the crew's call.
The finished line draws as hose, with a coupling every 100 feet when the aerial has a ground scale, and its length is written to the record the moment it lands. The review lists every line with its length and, when the department's inventory says how much supply hose the rig carries, whether the lay was longer than the bed. Anyone who can lay a line can disconnect one.
The fireground rules hold, whatever you click:
- a hydrant feeds one line, and an out-of-service hydrant feeds none,
- an FDC takes two lines, one per inlet, only from a rig, and an out-of-service FDC takes none,
- a drop tank takes two lines, from rigs or on to a second drop tank,
- a water source takes any number, each from a rig, and an out-of-service one (a dry pond) takes none,
- a line reaches a rig only once it is on the map and on scene,
- engines, trucks and tenders take a line; a medic or a command vehicle does not,
- two ends are connected once.
Only hydrants placed on the aerial count. A hydrant in a street photograph is scenery. Drop tanks and water sources are placed on the aerial only. A scenario can also open with lines already laid: see the Supply line element in the builder.
Drop tanks#
Where there are no hydrants, a crew sets up its own water. Once an engine or a tanker is on scene, anyone assigned to it can press Set a drop tank under the aerial and tap where the tank goes. On an aerial with a ground scale it starts at its real size, about 14 feet on its long side. Drag it into place, turn it with the rotation slider so the tenders can back up to it, and size it with − and + (or scroll on a computer); Reset scale puts it back to its real size. Done puts the button back.
A tank you set works like one the scenario's author placed: lay supply lines to it from the engines drafting, or on to a second tank, two lines at most. Its lines go with it when it is moved. Anyone on your rig can move it or take it up; nobody else's crew can. A tank with a line on it cannot be taken up until the line is disconnected, so the record never shows a line to nothing.
The instructor can set, move and take up any drop tank at any time. In a placement-only drill, anyone can, once it has started. A drill holds ten drop tanks at most, and each one goes in the record with the rig, the person and the time. Pushing a new situation never moves or removes them.
Rigs with nobody aboard#
A scenario can include apparatus no one is assigned to. The instructor positions those as they arrive, using the same aerial and the same controls.
Who can position what#
| Their own rig | Anyone else's | |
|---|---|---|
| Company member | After it arrives | No |
| Instructor | Yes | Yes, any time after dispatch |
Nobody positions another crew's apparatus. Where a company set up is that company's decision, and the review is worth less if somebody else made it.
With the module off#
Crews do not park anything. The instructor has already placed the apparatus in the builder, crews arrive on the side their rig sits on, and the aerial is there to look at so everyone can see where the rest of the assignment ended up. See Module: apparatus placement.
In the review#
The aerial replays like any other view, with every rig where it ended up and the sides marked. Positioning discussions go better with it on a screen everyone can see.
A rig placed and then dragged is one correction in the record, not two placements, so the review shows where it finished.